• Contact
  • About
  • ISSN 3049-9720
  • Authors and editors
NEWSLETTER SIGN UP
Yorkshire Bylines
Advertisement
  • Home
  • News
    • Brexit
    • Culture
    • Education
    • Environment
    • Home Affairs
    • Transport
    • World
  • Politics
  • Opinion
  • Society
    • Food
    • Music
    • Poetry
    • Sport
  • Business
    • Economy
    • Science and Technology
    • Trade
  • Region
No Result
View All Result
  • Home
  • News
    • Brexit
    • Culture
    • Education
    • Environment
    • Home Affairs
    • Transport
    • World
  • Politics
  • Opinion
  • Society
    • Food
    • Music
    • Poetry
    • Sport
  • Business
    • Economy
    • Science and Technology
    • Trade
  • Region
No Result
View All Result
Yorkshire Bylines
Home News Environment

Ripon Cathedral accused of not consulting properly with the city over £8mn annexe plans

As questions to Ripon Cathedral go unanswered, their ‘consultation’ is called into question by campaigners and local organisations

Brian McHugh by Brian McHugh
27-02-2024 16:42
in Environment, Region
Reading Time: 8 mins read
A A
Side elevation of Ripon Cathedral with tulips in the foreground

image by Brian McHugh. Used with permission

Share on Bluesky

Ripon Cathedral’s £8mn annexe plans continue to cause frustration for environmental campaigners, as they accuse the Cathedral of acting in an empty and cynical fashion, by offering no new plan to save the 11 threatened trees, but instead pushing ahead with the plans submitted in December 2022.

Ripon Cathedral launched its ‘consultation’ into a north side development for their annexe earlier this month, after originally calling a ‘pause’ to their submission plans in January. This new consultation consists of:

  • a new leaflet;
  • new slides on a PowerPoint presentation, which only lists the supporting organisations and does not give the impartial information by listing all objecting organisations;
  • an online feedback form which has been criticised for its emotive and leading questions, as well as the omission of any mention of the impact to the trees.

This online feedback form can be completed multiple times by the same person, clearly invalidating any responses which are given, as it can be manipulated. Additionally, there are now a number of drop-in sessions at the cathedral, staffed by members who cannot provide answers to the questions from the public.

Campaigners emphasise that this consultation launch only serves to highlight the fact that there has been no public consultation on these north side plans – which would have been a major failing on the part of the applicant and could have seen the proposal refused. Had a consultation been done in a timely manner, this issue could have been presented to the planning committee long ago.

Ripon Cathedral: a consultation for appearances’ sake

Of the 22 drop-in sessions, all but one of them is held within the cathedral, or 95% of sessions. Some 16 of the 22 sessions, or 73% overall, are scheduled during the times of 9am–5pm, meaning that a significant majority of people cannot attend. For those who do attend, questions cannot be answered by staff, and the public are invited to email in their questions, which often go unanswered. There are limited records kept of discussions with the public at these sessions, as few staff carry a notebook to record them.

All this leaves campaigners frustrated that this newly launched consultation is for appearances’ sake, rather than a meaningful and genuine attempt to engage in good faith with the public.

A recent public comment on the council planning portal bluntly stated:

“I attended the Cathedral display and was horrified to only experience continued ‘indoctrination’ and no sign of any creative lateral thinking ‘consultation’: clearly the application’s ‘on hold’ period is just a blatant excuse for the Cathedral to attempt to muster cooked up figures to try and prove the above applications have any support from the people.”

Failure to engage with the public

Additionally, Ripon Cathedral and Chapter did not send any representative to a recent public meeting, where the aim of the meeting was to arrange a community consultation event to help rebuild relationships between the Cathedral and the community. This will be the second open public event that the Cathedral has been invited to, after ignoring the first overture from the public. By sending no representatives to the recent meeting, the Cathedral is positioning itself as not being prepared to engage.

How big will the Ripon Cathedral annexe be?

In figures revealed to Yorkshire Bylines only last week – over 14 months from the original submission of the plans – the dimensions of the annexe finally became clear. The Cathedral has made no effort to make these details public, nor can they be found on the planning portal.

The length of the annexe will be 41.8m, or 137.9 feet long, with a width of 24.7m, or 81.5 feet. The plain issue is that the width of the Minster Gardens from the east boundary wall to the west boundary wall is only 46.5m wide, so the width of the annexe is more than half of the council-owned Minster Gardens, or Kirkgate Park, one of the historic names for this area as recently revealed by Ripon Civic Society.

Ripon Cathedral annexe dimensions

Scheduled monument consent needed

As Ripon Civic Society noted on an application by the Cathedral to demolish boundary walls in order to ‘fit in’ their new annexe, consent is needed for this action:

“The application by Ripon Cathedral involves partial demolition and rebuilding of the Grade II* curtilage listed Old Deanery wall and ‘adaption’ and partial demolition of wall C1/3 (Grade II* listed with the Courthouse), which connects the Courthouse with the workshop in the stone yard.”

Ripon Civic Society has recently published a leaflet, entitled ‘Ripon’s Kirkgate Park – An Appreciation’, which outlines the historical significance of this area through the centuries, and highlights that the park lies within a scheduled ancient monument and therefore needs scheduled monument consent from the secretary of state for any works.

Fears of gypsum dissolution

North Yorkshire Council’s own Lead Local Flood Authority submitted comments on the planning portal and drew attention to the dangers of gypsum dissolution in the area – an issue that campaigners have long stressed. In comments dated 23 February, the council noted, “Due to risk of gypsum dissolution, disposal via infiltration has been discounted”.

Campaigners have also emphasised recent development cases in the proximity of the Cathedral, which were initially objected to, owing to concerns over gypsum and potential impact to the Cathedral:

“A high risk of ground dissolution within the gypsum-rich bedrock underlying the site is recorded in the area, and ground dissolution is a known, and well recorded hazard, in the Ripon area as a whole.”

Only four years ago, an application to build townhouses behind Kirkgate met with objection from Historic England, who stated:

“The application site is located in the core of Ripon Conservation Area, close to several listed buildings and adjacent to (within 17 meters) the scheduled area of Ripon Minster. The archaeological potential of the scheduled area is extremely high, with stratified deposits surviving from the 7th century AD, much of which includes burials and evidence for early ecclesiastical organisation and related structures.”

Campaigners, then, remain perplexed as to the rationale behind Historic England’s support for the annexe project, when the organisation has indicated that it is mindful of development in a location farther away than the annexe building. Campaigners argue that the risks must be increased by a closer proximity, especially when the western Grade II listed boundary wall is already showing signs of having structural issues and walls in close proximity have been ‘pinned’ before to help with stability.

Ripon Cathedral: map of surrounding area
Courtesy of Google Maps

Repeated failure to respond to press enquiries

Written questions to the Cathedral continue to go unanswered and although asked for a comment on the current process, Ripon Cathedral offered no response.

Sadly, this has now become their repeated response to press enquiries, from this publication and others. They simply ignore them and continue to bulldoze ahead with their unchanged plans. How this approach can be viewed as one which unites a divided city is a baffling viewpoint.

Sign up for the Yorkshire Bylines newsletter

* indicates required

Consent for having Bylines Network store my submitted information

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices.

Brian McHugh

Brian McHugh

Brian has lived in North Yorkshire for over 10 years. He is very interested in climate related issues and has recently edited a climate book due for release later this year. Air pollution and chemical pollution are particular areas of interest for him. Follow him on Bluesky

Related Posts

The Tricolor team standing outside their storefront on Church Street
Economy

Is York’s flagship business incubator still working?

by Gabriel Macarthur
7 November 2026
Architect's imagining of the new Dewsbury Market development.
Region

Dewsbury Market: a place where the town has always come together

by John Heywood
5 November 2026
A flock of sheep in front of a night sky lit up with many fireworks
Culture

A bang too far: isn’t it high time we rethought fireworks?

by Kay Johnstone
4 November 2026
Todmorden Book Festival Logo
Culture

Todmorden Book Festival welcomes literary heavyweights

by Kay Johnstone
4 November 2026
The Milner York's The Garden Room
Food

Review: A Night at The Milner York Hotel

by Graham Clark
3 November 2026
Next Post
Mobile phone and laptop

Police must come clean on media surveillance

PLEASE SUPPORT OUR CROWDFUNDER

BROWSE BY TAGS

Art Books Boris Johnson Bradford Charity Climate Change Cost of Living Covid-19 Creative Industries Crime Democracy Devolution Donald Trump Environment Equality Experience Farming Festival Gaza Conflict General Election History Human Rights Immigration Iran Journalism Keir Starmer Labour Leeds Media Mental Health NHS Northern Ireland Protocol Pollution Poverty Recipe Refugees and Asylum Seekers Restaurants Retained EU Law Review Rishi Sunak Sheffield Theatre Travel Ukraine USA
Yorkshire Bylines

We are a not-for-profit citizen journalism publication. Our aim is to publish well-written, fact-based articles and opinion pieces on subjects that are of interest to people in Yorkshire and beyond.

Yorkshire Bylines is a trading brand of Bylines Networks Limited which is separate to, but allied with, Byline Times.

Learn more about us

No Result
View All Result
  • About
  • Authors and editors
  • Complaints
  • Contact
  • Donate
  • Letters
  • Privacy
  • Network Map
  • Network RSS Feeds
  • Submission Guidelines
  • Download the Bylines Network App

© 2020-2026 Yorkshire Bylines. Powerful Citizen Journalism. ISSN 3049-9720

No Result
View All Result
  • News
    • Brexit
    • Education
    • Environment
    • Health
    • Home Affairs
    • Transport
    • World
  • Politics
  • Opinion
  • Society
    • Culture
    • Dance
    • Food
    • Music
    • Poetry
    • Recipes
    • Sport
  • Business
    • Economy
    • Science and Technology
    • Trade
  • Region
  • The Davis Downside Dossier
  • The Digby Jones Index
  • Cartoons by Stan
  • Authors and editors

Newsletter sign up

CROWDFUNDER

© 2020-2026 Yorkshire Bylines. Powerful Citizen Journalism. ISSN 3049-9720